Great River Energy proposes to improve the Wilbert to Blue Earth (FE-WB) 69-kV transmission system in Martin and Faribault counties by rebuilding 21.9 miles of the
FE-WB 69-kV transmission line. This rebuild and maintenance of the line (that was built in 1970) will address issues associated with high winds and improve the reliability of the transmission system.
Quick facts
- Length: 21.9 miles
- Voltage: 69 kV
- Structures: Wood, wood laminate and steel Spans – 250 to 350 feet apart
- Right of way: 70-foot-wide right of way. 35 feet on each side of the centerline
- Permits: Road authority
Schedule
-
EasementsSpring/Summer 2021
-
ConstructionWilbert to East Chain will be constructed in May - October 2022. East Chain to Blue Earth will be constructed 2024.