HW 69-kV transmission line rebuild - Great River Energy

HW 69-kV transmission line rebuild

Great River Energy will be rebuilding the “HW” 69-kV transmission line in Cass County to help ensure continued reliable electric service to the area. This 12.5-mile line, which was built in the early 1950s, needs to be rebuilt due to its age, condition and wire size.

Beginning at the Birch Lake Substation in Hackensack, Minn., the line runs east to 40th Ave NW then north to County State Aid Highway 5. Then it runs east along County State Aid Highway 5 for 7.5 miles to Child Lake. Here the line turns and runs cross-country south and east to County State Aid Highway 11 and continues to the end point at the Wabedo Substation.

Great River Energy is planning to rebuild the transmission line along the existing centerline. Minor alignment changes may be discussed with individual landowners.

The transmission line will be rebuilt using single wood poles, generally 70 to 80 feet above ground, placed 350 to 400 feet apart. Some taller specialty poles and longer or shorter spans may be required. Directional changes or angles will require guy wires and anchors to stabilize poles. 

Open house

Property owners and community members are invited to attend an open house meeting to learn more about the project:

Thursday, May 26, 2022
4-6 p.m
.
Birch Lake Town Hall
3611 40th Ave. NW
Hackensack, MN 56452

No formal presentation will be given. Attendees are encouraged to stop in anytime between 4 and 6 p.m.

Permits and Approvals

  • Cass County ordinances do not require a conditional use permit for this rebuild project. Great River Energy will work with county, state and federal agencies to secure road crossing permits and any other required environmental or construction permits. Great River Energy has existing easement rights to rebuild, operate and maintain the transmission line. The easement area will continue to be maintained to be clear of trees and vegetation to allow for the safe operation of the line. Some areas may require additional easement rights or clarification of rights.
Quick facts
  • Length: 12.5 miles
  • Voltage: 69 kV
  • Structures: Wood poles
  • Spans: 350 to 400 feet apart
  • Right of way: 70-foot-wide right of way; 35-feet on each side of the centerline
Schedule
  • Notifications/survey
    Fall 2021
  • Easements/environmental permits
    Summer 2022
  • Engineering design
    2022
Project Contacts
Dale Aukee
Great River Energy
Phone: 612-840-4019
Mark Strohfus
Great River Energy
Phone: 763-445-5210
Media Contacts
Lori Buffington
Phone: 763-445-5714