Morris to Johnson Junction to Ortonville 115-kV transmission line rebuild - Great River Energy

Morris to Johnson Junction to Ortonville 115-kV transmission line rebuild

Missouri River Energy Services (MRES) and Great River Energy propose to rebuild approximately 38 miles of an existing 115-kilovolt (115-kV) transmission line located in Big Stone and Stevens counties in Minnesota. Rebuilding this existing 115-kV transmission line is necessary to increase its capacity to deliver power and improve system reliability. This rebuilding project will meet transmission system needs in this area, which were identified in a recent facility study completed by the Midcontinent Independent System Operator (MISO). This study reveals that the existing transmission line conductors are sized too small to deliver the additional power generated by anticipated wind and solar projects in this area.

Quick facts
  • Length: 38 miles
  • Voltage: 115 kV
  • Structures: Wood or steel H-frame poles
  • Spans: 500 to 700 feet between structures
  • Right of way: 150-foot-wide right of way. 75 feet on each side of the transmission centerline.
  • Easements: Existing (originally executed 1950-1951)
Schedule
  • Easements
    Re-define/amend existing easements Fall 2019/Winter 2020
  • Construction
    Fall 2020
  • In service
    December 2021
Project Contacts
Dale Aukee
Great River Energy
Phone: (763) 445-5978 or (612) 840-4019
Brian Zavesky, P.E.
Missouri River Energy Services
Phone: (605) 330-6986
Media Contacts
Lori Buffington
Phone: 763-445-5714
Twitter: @lbuffing